India to Build Longest 800kV UHVDC Transmission Line
ABB has teamed up with India’s national electricity grid operator Power Grid Corporation of India Limited (POWERGRID) in a mega project worth over $640 million for ABB to deliver a transmission link that will have the capacity to bring reliable electricity to more than 80 million people. The Raigarh-Pugalur 800 kilovolt (kV) ultra-high-voltage direct current (UHVDC) system will connect Raigarh in Central India to Pugalur in the southern state of Tamil Nadu.