
How Eneco can provide the required capacity to power the Dutch railways Eneco and NS originally planned to reach 100% of all trains to be powered by wind energy by 2018. But they were able to speed up this process and reached their objective one year earlier in January 2017. "If the Dutch railways sourced 100% of the 1.4 tWh of energy they needed each year from within the Netherlands, this would decrease availability and increase prices of green power for other parties," explains Eneco's Michel Kerkhof. "That is why half of the demand will be sourced from a number of new wind farms in Belgium and Scandinavia, which have been specifically assigned for this contract. A key objective is to avoid procuring energy from the limited existing number of sustainable energy projects in the Netherlands, thus promoting renewable growth both domestically and Europe-wide. "This partnership ensures that new investments can be made in even newer wind farms, which will increase the share of renewable energy," confirms Kerkhof. "In this way, the Dutch railways aim to reduce the greatest negative environmental impact caused by CO2 in such a way that its demand actually contributes to the sustainable power generation in the Netherlands and Europe. [brightvibes.com]